Licensed & Insured in Louisiana | Hurricane-Resilient Construction
    Serving Calcasieu Parish Since 2010(337) 426-5868
    Remodeling Lake Charles
    Free Quotes
    (337) 426-5868
    Get Free Quote
    From First Call to Finished Kitchen

    Our Proven Remodeling Process

    Five clear steps. Fixed prices. Zero surprises. This is how we've completed hundreds of kitchen remodels across Southwest Louisiana — and how we'll handle yours.

    Licensed & Insured in Louisiana
    Fixed-Price Contracts
    1-Week Design Turnaround
    Lifetime Workmanship Warranty

    Every Project. Every Time. The Same Standard.

    We built this process after remodeling kitchens across Calcasieu Parish for over a decade. It eliminates the chaos, protects your budget, and ensures the finished product matches the design you approved.

    01
    60–90 minutes

    Free In-Home Consultation

    No pressure. No commitment. Just answers.

    One of our senior designers visits your home in Lake Charles or anywhere in Calcasieu Parish. We measure every inch, listen to your goals, assess your current layout, and talk honestly about what's possible within your budget. We're not salespeople — we're craftsmen who want to make sure we're the right fit for your project.

    • Full kitchen measurement and assessment
    • Layout and workflow evaluation
    • Discussion of your style preferences and inspiration
    • Honest budget conversation — no bait and switch
    • Insurance damage documentation if applicable
    02
    5–7 business days

    3D Design & Material Selection

    See your new kitchen before a single nail is pulled.

    Within one week of your consultation, we present a full 3D rendering of your new kitchen. You'll see exactly how it will look — cabinet placement, countertop colors, lighting, flooring — all visualized in photorealistic detail. We work collaboratively until the design is exactly right. This is your kitchen. We get it right before we build it.

    • Full photorealistic 3D renderings
    • Up to 3 design revision rounds included
    • Material samples delivered to your home
    • Cabinet layout optimization for your cooking style
    • Countertop, backsplash, and flooring coordination
    03
    2–3 business days after design approval

    Fixed-Price Quote & Contract

    The price you sign is the price you pay.

    Once the design is finalized, we present a detailed, line-item fixed-price contract. Every cost is spelled out — cabinets, countertops, labor, plumbing, electrical, permits, and contingency. We don't do hidden fees or surprise change orders. If we encounter something unexpected during demolition, we discuss it transparently before any additional cost is incurred.

    • Itemized breakdown of every cost
    • Fixed total price — no surprise change orders
    • Payment schedule tied to project milestones
    • Permit application filed by our team
    • Project start date confirmed in writing
    04
    4–10 weeks depending on scope

    Professional Construction

    Clean, efficient, and respectful of your home.

    Our licensed and insured crew arrives on time, every day. We protect your floors and adjacent rooms with professional barrier systems, clean up at the end of each work day, and communicate proactively about progress and scheduling. Our tradespeople — carpenters, plumbers, electricians — are all licensed in Louisiana and held to strict quality standards.

    • Daily site protection and end-of-day cleanup
    • Licensed plumbing and electrical subcontractors
    • All Calcasieu Parish permits pulled and inspected
    • Weekly progress updates via phone or text
    • Hurricane-resilient installation methods throughout
    05
    1 day

    Final Walkthrough & Reveal

    Your dream kitchen — exactly as designed.

    Before we call the job complete, we walk through every detail with you. Every cabinet door is adjusted, every seam is inspected, every fixture is tested. We don't leave until you're 100% satisfied. Then we hand you your warranty documentation, review care instructions for your new surfaces, and celebrate the kitchen you've always wanted.

    • Full punch-list walkthrough with the project manager
    • All deficiencies corrected before final payment
    • Lifetime workmanship warranty documentation provided
    • Material care and maintenance guide
    • 30-day follow-up call to ensure satisfaction

    Typical Project Timelines

    2–3 Weeks

    Cosmetic Refresh

    New countertops, cabinet refacing, hardware, paint. No layout changes.

    4–6 Weeks

    Mid-Range Remodel

    New cabinets, countertops, appliances, lighting. Minor layout changes.

    8–12 Weeks

    Full Gut Renovation

    Down to the studs. New layout, plumbing, electrical, everything.

    Timelines begin after permit approval and material delivery. We provide a confirmed start date in your contract.

    Common Process Questions

    Will I be able to use my kitchen during the remodel?

    During most phases — design, ordering, permitting — your kitchen is fully usable. During active construction (typically 4–10 weeks), the kitchen will be out of commission. We can recommend portable appliance setups to minimize disruption.

    How do you handle unexpected issues behind the walls?

    Post-storm homes in SWLA sometimes reveal moisture damage, outdated wiring, or mold once demolition begins. We document everything, pause work, and walk you through the options before proceeding. No surprise charges without your written approval.

    Do you handle insurance claims for hurricane damage?

    Yes. We work directly with homeowners and adjusters to provide detailed line-item documentation for insurance-covered repairs and renovations. We have extensive experience with post-Laura and Delta claims in Calcasieu Parish.

    What if I want to make a change after signing the contract?

    Minor changes are common and we handle them with a simple written change order showing the cost impact. We never start change work without your approval. We encourage all decisions to be finalized at the design stage to avoid delays.

    Ready to Get Started?

    Book your free in-home consultation today. No sales pressure — just an honest conversation about your kitchen and what it will take to transform it.

    Get Free Quote